Tag: TDD
How can we predict the probability distribution of peak outflows from a detention dam without running thousands of Monte Carlo simulations? This work answers that question with a closed-form, theoretically derived probability distribution (TDD) of…
The design of hydraulic structures needs to account for a trade-off between implementation costs and flood damages, as well as for the impacts on basins hydrological responses over a wide spectrum of events. In this…
Impact of Detention Dams on the Probability Distribution of Floods | Hydrology and Earth System Sciences (2021)
Understanding the spatial variability of key parameters of flood probability distributions represents a strategy to provide insights on hydrologic similarity and building probabilistic models able to reduce the uncertainty in flood prediction in ungauged basins.…
The flood frequency estimation in ungauged basins requires the development of innovative statistical tools aimed to improve the available techniques for risk assessment. This research is aimed to better understand and classify the hydrological processes…
